…久久精品99久久香蕉国产|亚洲人成伊人成综合网久久久|日韩精品中文字幕乱码一区|日韩午夜无码不卡视频

Carbon Dioxide Compressor Series A and Series B Successfully Commission in Xinjiang Group’s Purification Workshop

來(lái)源: xinjiang
編輯: 阿勇
發(fā)布時(shí)間: 2013-06-26
訪(fǎng)問(wèn)量: 4419

Xingjiang- On June 21, the carbon dioxide compression section of Xinjiang Group’s Purification Workshop officially commissioned, sending first flow of air for the coal gas of gasification furnace of purification workshop. 
    To ensure the success of one-time commissioning, workshop leaders deployed tasks in advance and organized employees to re-fasten each bolt at each flange connection part, purge nitrogen pipelines, clean equipment and check and eliminate safety hazards. During commissioning, workshop leaders and professional workers had a whole-process tracking of the commissioning link, strengthened central control analysis, strictly controlled process indicators, coordinated and solved emerging problems, making the entire commissioning process in order and each process indicator up to standard. One-time commissioning was successfully achieved.
    The success of carbon dioxide compression lays a solid foundation for the overall commissioning of purification workshop.